# Roles (RACI) > 按项目规模裁剪并记录原因。 | 阶段/角色 | PM | PJM | Arch | Dev | QA | Council | |---|---|---|---|---|---|---| | 需求输入 | R | C | I | I | I | I | | 验收标准 | A | C | C | I | I | I | | 计划制定 | C | A/R | C | I | I | I | | 架构设计(可选) | C | C | A/R | I | I | I | | 任务拆分 | C | A/R | C | R | I | I | | 功能开发 | I | C | C | A/R | I | I | | 代码评审(可选) | I | C | C | A/R | I | I | | 测试 | I | C | I | C | A/R | I | | 验收评审 | C | C | C | C | C | A/R | | 归档 | I | A/R | I | I | I | C |